We started 2009 with the quick and effective installation of four newly designed Visual act winches on the fly floor at the Oslo New Theatre. The winches are a complement to an existing Visual act winch system and part of ongoing modernization of the winch system in the charming theatre.
Thanks to intensive testing of the winches, the installation was completed in two days with minimal disruption to activities at the theatre.
